Savannah Nickel – 13 MW

CPG won the tender for the 10.2 megawatt build, own, and operate power station for Kimberley Nickels Savannah Nickel Project. Utilising the latest in MTU series 4000 engines, CPM won the project by demonstrating a significant fuel saving.Here, CPG has been able to utilise the MTU product which is the 12V 4000 engine as a power station prime mover which over the years has proven to be a very reliable platform. Upgraded in 2014 to 11.5 MW and again in 2015 to 13 MW to keep up with the minesite demand.