Horizon Power – Mt Magnet Gas – 2.6 MW

As part of the MidWest power purchase agreement a new gas station was to be installed in Mt Magnet. Having to wait for the previous site to be removed, CPG installed a temporary diesel station to provide power for the interim. CPG is currently completing installation of the site with 5 x CAT containerised gas units and 2 x Cummins diesel standby sets totaling 2.6 MW installed capacity. Project completion was July 2016.