FMG – Kanyirri Fuel Facility – 2.5 MW

In addition to the Port Hedland infrastructure already installed for FMG, Contract Power was contracted to install and maintain a powerstation at the Kanyirri facility. It consists of 3 x Cummins QSK23 900kVA units powering the fuel unloading facility for the minesite infrastructure. Built and commissioned in 2012.